1.4.4 Products
A. This life safety system specification shall be conformed to in its entirety to
ensure that the installed and programmed life safety system shall
accommodate all of the requirements and operations required by the
building owner. Any specified item or operational feature not specifically
addressed prior to the bid date shall be required to be met without
exception.
B. Submission of product(s) purported to be equal to those specified herein
shall be considered as possible substitutes only when all of the following
requirements have been met:
1. Any deviation from the equipment, operations, methods, design or
other criteria specified herein shall be submitted in detail to the FSU
Engineer and the local fire marshal having jurisdiction a minimum of
ten (10) working days prior to the scheduled submission of bids. Each
deviation from the operation detailed in these specifications shall be
documented in detail, including page number and section number,
which list the system function for which the substitution is being
proposed. The contractor or substitute bidder shall functionally
demonstrat
e that the proposed substitute products are in fact equal in
quality and performance to those specified herein.
1.4.5 General Equipment and Materials Requirements
A. All equipment furnished for this project shall be new and unused. All
components shall be designed for uninterrupted duty. All equipment,
materials, accessories, devices and other facilities covered by this
specification or noted on the contract drawings and installation specification
shall be best suited for the intended use and shall be provided by a single
manufacturer. If any of the equipment provided under this specification is
provided by different manufacturers, then that equipment shall be “Listed
as to its compatibility by Underwrit
ers Laboratories (UL), if such
compatibility is required by UL standards.
1.4.6 Satisfying the Entire Intent of these Specifications
A. It is the contractor’s responsibility to meet the entire intent of these
specifications.
B. Deviations from the specified items shall be at the risk of the contractor
until the date of final acceptance by the fire marshal having jurisdiction, and
owner’s representative.
C. All costs for removal, relocation, or replacement of a substituted item shall
be at the risk of the Contractor.
END OF SECTION ONE